Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra-addon domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/themeparkarchite/public_html/wp-includes/functions.php on line 6114
Theme Park Architect - Page 18 of 25 -

Plumbing Engineer

What is an Plumbing Engineer? A plumbing engineer is a professional who specializes in designing, installing, and maintaining plumbing systems in buildings and other structures. Plumbing engineers are an essential part of the building and site design process, as they […]

Plumbing Engineer Read More »

Blue Sky

What is a Blue Sky? The Blue Sky design phase is the first pre-concept design phase that traditionally was unique to theme park design projects. When a project is said to be in ‘Blue Sky’ that means a small group

Blue Sky Read More »

Utilidor

What is a Utilidor? A Utilidor is an above water table but below finished grade hardened tunnel constructed for the conveyance – out of sight from theme park Guests – of utilities, support rooms, and Cast Members at the Magic

Utilidor Read More »

Mock-up

What is a Mock-up? A mock-up, with regard to theme park design, is a partial full-sized building or site design feature component used for a variety of reasons by the theme park design team. Mock-ups are extensively used in the

Mock-up Read More »

Site Development

What is Site Development? The term Site Development, with respect to theme park design, is an all encompassing term specifically related to the site civil engineering – and all other applicable engineering design efforts – required to prepare a theme

Site Development Read More »

Scroll to Top