Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra-addon domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/themeparkarchite/public_html/wp-includes/functions.php on line 6114
Theme Park Architect - Page 20 of 25 -

Design Development Phase

What is the Design Development Phase? The Design Development Phase is an advancement of the Schematic Design Phase. The Design Development phase – often referred to as the ‘DD’ phase – is a further refinement of the projects’s technical and

Design Development Phase Read More »

Schematic Design Phase

What is the Schematic Design Phase? The Schematics Design Phase is an advancement of the Feasibility Design Phase. The Schematic Design phase – often referred to as the ‘SD’ phase – is a further refinement of the projects’s design. The

Schematic Design Phase Read More »

Not In Contract

What is Not in Contract? The term ‘Not in Contract’ – often abbreviated in design drawings as N.I.C. – often refers to information on drawings and contracts that is adjacent or applicable to the scope of services but is not

Not In Contract Read More »

Additional Services

What are Additional Services? The term Additional Services, with respect to theme park design, can be defined as any design or consulting services or deliverables not originally contained within the scope of the Contract – services that were not specifically

Additional Services Read More »

Scroll to Top